PO Box 786 Strawberry Hills NSW 2012
SKU: N/A

This product is currently out of stock and unavailable.

  • 【Size】: Dog Training Leads, black and red, 2 sizes 6 meter and 10 meter, Width 2cm.
  • 【with Comfortable Padded Handle】: The dog training leash with a comfortable padded handle, which is comfortable while dogs pulling and protects your hand from rope burn.
  • 【Material】: Gog training lead is made of strong nylon with durable metal Buckle and a velcro.
  • 【Widely Use】: Dog Training Leads is suitable for many pets, such as dogs, cats, teddy, chihuahua, pomeranian, golden retriever, husky, alaskaand other breeds.
  • 【Swivel-Style Stainless Steel Buckle】: The dog leash equipped with a rotatable durable metal Buckle for easy attachment to the dog’s collar, rotate 360 degrees.

Long Lead-Training Leash for Pets, Long Training Leads for Dogs/Puppy Training,Play,Camping,Extra Long Dog Leash

Item Weight

190 g

Country of origin

China

Package Dimensions

17.7 x 15.5 x 3.7 cm; 190 Grams

Reviews

There are no reviews yet.

Be the first to review “WD&CD Long Lead-Training Leash for Pets, 10 Meters Training Leads for Dogs/Puppy Training,Play,Camping,Extra Long Dog Leash – Black”

Your email address will not be published. Required fields are marked *